An unfinished problem-solving product, preserved with its open questions.
ShelvedProblem solvingWeb concept · historical record
The project
Resolve was recorded as a product intended to help work through problems. Its purpose, current build, and success criteria were still unsettled. The September 21 project record explicitly shelves it for a possible later revisit; the PCG suite retains a Define screen rather than a finished tool.
The setbacks and the lessons. Documented history comes from preserved records; editorial assessment is a retrospective judgment. When a reason is missing, it stays unknown.
Why it stopped
Documented history
Donald explicitly shelved Resolve on September 21, with a note to revisit. In the same correction, he prioritized getting the assistant properly grounded in the existing chats before starting something new. No detailed technical reason for shelving Resolve was supplied.
Where it went wrong
Editorial assessment
The continuity record kept Resolve marked Active while its current version, exact failure, and standard for “works correctly” were still missing. The recovered public suite also offers a definition form rather than a demonstrated solution. The concrete failure is the missing product handoff: the name survived more clearly than the job and evidence needed to continue it.
What could have been done better
Editorial assessment
Recover the existing brief and build first. Establish one intended user, one problem, and one observable successful result; then reproduce the actual failure before proposing a repair. Keep commercialization and additional features behind that single useful demonstration.